x
发布需求
咨询
聊天
留言
意见反馈
返回顶部
*标题:
*内容描述:
首页 石材、瓷砖、地板、墙面材料 马赛克 石材马赛克 KST Building Materials Co., Ltd. Silver surface wire mosaic mix-color metal mosaic

返回上一页

供应商: KST Building Materials Co., Ltd.前往供应商主页 >>
办公地点 广东 江门市 新会区 广东 江门市 新会区
供应商类型: 制造商,出口商
成立年份: 2016 年
年营业收入: 1200 万元-3000 万元
员工总数: 10-50人
KST Building Materials Co., Ltd.
Silver surface wire mosaic mix-color metal mosaic

Silver surface wire mosaic mix-color metal mosaic

交货价:  ¥ 210 - 222 块/张/片/个
型号: 5027
最小起订量: 72 块/张/片/个
交货周期: 10 天
样品是否免费: 收费
主要出口港: FOSHAN
产品详情


image.png

image.png

 

 

 

Silver surface wire mosaic mix-color metal mosaic

 

 

 

 

 

 

 

 

 

 

 

Construction method:

1:Prepare the required materials:

Adhesive caulking patch, caulking sponge, paving serrated knife, bucket or basin, balance ruler, rag


2:Construction steps:

1. Grouting agent mixing: medium-in-one two-in-one adhesive caulking agent to water, the ratio of water to

powder is 1:4, stir until no powder, the slurry is guaranteed to be used within 2 hours (Note: Do not soak the

water before the mosaic is laid )

 2. Flatten the base surface: the paving base surface should be clean and flat, then use the paving serrated

knife to smooth the adhesive to the wall; the construction environment temperature is guaranteed between 5

and 39 degrees Celsius.

 3. Preparation for paving: use a serrated knife to scrape the wavy stripes on the patch plane.

4. Paving: When laying the mosaic, use the balanced balance ruler to put a mosaic on the reference surface

to ensure the balance between each mosaic.

 5. Plaster reinforcement: After the mosaic is laid, gently press the surface with a caulking sponge. Let the

surface level and mix evenly to ensure complete stability.

6. Preparation of caulk: stir the caulk.

7. Caulking: Fill the mosaic seam carefully with a sponge knife. The mosaic seam is not filled with dust and

it is inconvenient for future cleaning. (Note: a soft tool must be used. The final coagulation strength at the

seam is 28 days. During the period, try to avoid soiling).

 8. Cleaning: Prepare a clean rag. After the filling is completed, the surface can be cleaned after 1 hour.

Daily cleaning can be done directly with a wet towel.


评论
${0} 条评论 ${0} 条评论
暂无评论
发表评论
公司信息
公司简介
品牌
服务区域
亚洲
欧洲
非洲
美洲
其它
生产/供应能力
工厂基本信息
案例名称: 声明:以上内容由设计服务机构上传
总公司
分支机构
* 沟通语言(口语):
请尽量勾选您能提供服务的语言,能让您更快获得匹配询盘和商机。
所在地官方推荐语言: 请选择地址 选择项目所在地后,我们将会推荐相应官方语言
其他沟通语言: 常见国际用语您可以直接选择
+ 添加更多 您可添加更多语言
不能为空!

审核未通过的原因:

* 沟通语言(书面):
请尽量勾选您能提供服务的语言,能让您更快获得匹配询盘和商机。
所在地官方推荐语言: 请选择地址 选择项目所在地后,我们将会推荐相应官方语言
其他沟通语言: 常见国际用语您可以直接选择
+ 添加更多 您可添加更多语言
不能为空!

审核未通过的原因:

如果没有您的语言,请联系我们:service@buildmost.com